VENTILAIRE LTD
Est. 2001
A little bit about us
Portfolio of Recent Customers
- Pfizer Pharmaceuticals
- Megger Instruments
- Geku Robotics
- Sheapherd Neame
- Veolia
- Chatham Historic Dockyard
- Quinn Estates
- Custodian Data Centre
- Fujiseal
- Constantia
- Shepway Commercial
- Discovery Park
- HMP Bedford
June 2022 Case Study: We have recently finished our first fix stage at a large refurbishment project at Megger Instruments in dover. This system is made up of one large air handling unit, two MVHRs with approximately 500m of ductwork throughout the building. We have been working alongside W.W.Martins the main contractor and Amdell. Over the next few weeks, the ceilings will be installed and second fix will be able to take place.
February 2022 Case Study: Phase 2 at Custodian has recently been completed. This time the duct sizes were slightly smaller than Phase 1, but should not be underestimated with the largest section being 4m x 2m weighing close to 600kg! Again this was a challenge for the whole team, but one that we thoroughly enjoyed.
November 2021 Case Study: Installation for custodian data centre in Kent. This is the largest ductwork we have installed to date with the biggest section of ductwork being 5m wide x 2m high. This was a fun but challenging job for all the team.
October 2021 Case Study: This is a recent installation in Rainham, Essex working along side Airpack 2000. This is the second job we have taken on for Airpack 2000. On this project we ducted fresh air and exhaust from three Boge air compressors. The client is extremely satisfied with the installation and we have since tendered two other projects.